back
Poured roof being filled with loose aggregate and empty plastic bottles.
In foreground is the walkway connecting the two 4X5m rooms on the second floor.
mxSteve at gmail dot com
You can reach Steve at the following address:
back
©2000 - 2010 FlyingConcrete. All rights reserved