Logo
 

street
 
The view of the construction from the street. The two-part main room roof construction can be seen here. The ramp of the stairway is to the left. The kitchen dome is topped with the water tank. It will be concealed with additional construction so as not to be an eyesore. Ladders are in the area where the bathroom will be.
 

mxSteve at gmail dot com
You can reach Steve at the following address:
add-ress

back

©2000 - 2010 FlyingConcrete. All rights reserved.