Logo
 

room
 
The main room with the roof finished. The floor will be raised some three or four inches because the original roof which here forms the floor was uneven. The main electrical junction box can be seen to the left. It will be covered by a painting or a piece of furniture. The additional electrical conduits can be seen chipped into the exisitng walls. They will be plastered over.
 

mxSteve at gmail dot com
You can reach Steve at the following address:
add-ress

back

©2000 - 2010 FlyingConcrete. All rights reserved.