Logo
 

The roof in the background has the shell applied and is ready to pour. The roof in the foreground has been poured with 3 inches of light weigh concrete. Note the pillars running down the center between the vaults.

mxSteve at gmail dot com
You can reach Steve at the following address:
add-ress

back

©2000 - 2010 FlyingConcrete. All rights reserved