Logo
 

2X2 and 1X2's support 3/8 re-bar.
Plaster lath goes on top of this.
On the left the "shell" has been applied the day before and is ready to pour.

Roof Forming

mxSteve at gmail dot com
You can reach Steve at the following address:
add-ress
Steve is tired of getting spammed so this is NOT a hot link.
back

©2000 - 2010 FlyingConcrete. All rights reserved